✓ Bigger savings in investment costs – up to 25% or more per PT connected.
✓ Lower operating costs for maintenance, repair and sludge disposal.
✓ Lower electricity costs thanks to bundling of wastewater purification.
✓ More stable operation, less noticeable load fluctuations thanks to relatively constant wastewater inflows.
✓ More beautiful single gardens due to missing manhole covers and open-air columns.
✓ Easier access to the wastewater treatment plants, e.g. for maintenance contractors, as there is only a single location.
✓ Simplified communication with the authorities, the maintenance contractor and the sludge disposal firm. One person with time and interest can be chosen to look after everything. Alternatively, an external caretaker can be appointed.
✓ Expandable: additional purification levels P + H can be retrofitted later if required.
✓ Can easily be constructed from prefabricated parts for up to 200 PT.